other lifts

contact

E-mail:sale@3nnn.com

Address:Tianpeng industrial park, Hu community, Guanlan Street, Longhua new district, Shenzhen City, China

Built-in boarding bridge

Built-in boarding bridge

The embedded boarding bridge is the boarding bridge embedded in the loading and unloading operation platform. The main board of the installed boarding bridge is horizontal to the upper plane of the lo...

E-mail:sales@3nnn.com
Parameters

The embedded boarding bridge is the boarding bridge embedded in the loading and unloading operation platform. The main board of the installed boarding bridge is horizontal to the upper plane of the loading and unloading operation platform. Fully integrated into the platform, in no loading and unloading operations, will not affect the platform’s other tasks. This type of structure of the boarding bridge is the most widely used, but also the most rapid one of the boarding auxiliary equipment. Its design is usually early in the structural design of the building has been the overall planning of which.

Material selection

1. Main support: special shaped steel pipe is used.

2, table material: table using 8mm non-slip net.

3, cylinder: Jinan production of high-precision wear-resistant cylinder.

4. Tires: high strength, load resistant, high pressure tires.

Hydraulic oil: No. 32 anti-wear hydraulic oil (Japanese waltz)

Hydraulic tubing: high-pressure double-layer steel mesh rubber tubing (Shenyang no. 4 Rubber Factory)

The equipped brake block (can effectively prevent the displacement of the boarding bridge during loading and unloading of the freight car).

8, the use of hand-operated hydraulic pump power, (do not need external power supply can easily achieve the height of the bridge regulation)

Adjustable length of cable chain can easily hook the truck, so that the boarding bridge and truck always close.